GSS finish the new heavy duty, resin floor installation for Aon, in their prestigious premises within the Leadenhall Building, London.
The old worn vinyl flooring was removed prior to surface diamond grinding to remove all the old adhesive and latex.
A new drainage system was installed with new manhole covers, pot and gully drains.
Resin coving was installed to all perimeter walls and a new 9mm thick, polyurethane resin screed supplied by Altro Resins was laid in the main kitchen, cold rooms, stores, servery and corridors.
This system provided Aon with a very heavy-duty, chemical and slip resistant floor finish, installed with a 15-year guarantee.
Click here to view the full case study.
Recent Comments